There are around four weeks to go and the construction of the new assembly hall and new logistics centre will be finished. An attractive, modern building has been erected between the main office and the existing production halls. The new building is linked to the existing production halls through a connecting corridor.
In total, 7,400 m2 additional space has been built and the total premises covers 51,000 m2.